ODOT Ramp Metering
Description
Install ramp metering on interstate system within the City of Cincinnati, in accordance with ODOT and USDOT standards and policy (includes some paving for queue ramps).
Project includes existing ramp metering in West Chester at the I–75 exit at Union Centre Blvd on–ramps in conjunction with interchange modification to DDI and along I–74 within Ohio.
Status: Existing and Planned
Timeframe: 2026 – 2032
Inventory
ODOT / KYTC Cameras |
---|
ODOT / KYTC Traffic Sensors |
---|
ODOT District 8 Field Equipment |
---|
ODOT District 8 Signal Operations |
---|
ODOT Dynamic Message Signs |
---|
ODOT Ramp Meters |
---|
ODOT Statewide TMC |
---|
ODOT Traffic Signal Control System |
---|
Services
TM05–Traffic Metering (ODOT) |
---|