ODOT Ramp Metering

Description

Install ramp metering on interstate system within the City of Cincinnati, in accordance with ODOT and USDOT standards and policy (includes some paving for queue ramps).

Project includes existing ramp metering in West Chester at the I–75 exit at Union Centre Blvd on–ramps in conjunction with interchange modification to DDI and along I–74 within Ohio.

Status: Existing and Planned

Timeframe: 2026 – 2032

Inventory

ODOT / KYTC Cameras
ODOT / KYTC Traffic Sensors
ODOT District 8 Field Equipment
ODOT District 8 Signal Operations
ODOT Dynamic Message Signs
ODOT Ramp Meters
ODOT Statewide TMC
ODOT Traffic Signal Control System

Services

TM05–Traffic Metering (ODOT)
Privacy Policy | Terms of Use & Accessibility