2050 OKI MTP TSMO Corridor 10 (Smart Lanes)
Description
Install/improve fiber, DMS, minor shoulder pavement, cameras, poles, power along 11 mile corridor on I–71 from I–275 to SR–48.
Status: Planned
Timeframe: 2027
Inventory
ODOT / KYTC Cameras |
---|
ODOT / KYTC Traffic Sensors |
---|
ODOT / KYTC Traveler Information System |
---|
ODOT ATMS |
---|
ODOT District 8 Field Equipment |
---|
ODOT District 8 Signal Operations |
---|
ODOT Dynamic Message Signs |
---|
ODOT Lane Control Devices |
---|
ODOT OHGO Traveler Information System |
---|
ODOT Statewide TMC |
---|
ODOT Traffic Signal Roadway Equipment |
---|
Private Vehicles |
---|
Services
TM01–Infrastructure–Based Traffic Surveillance (ODOT) |
---|
TM22–Dynamic Lane Management and Shoulder Use (DriveOhio CV/AV) |
---|