2050 OKI MTP TSMO Corridor 7 (Smart Lanes)
Description
Install/improve fiber, DMS, minor shoulder pavement, cameras, poles, ramp metering, hard shoulder running (HSR), power along 5.6 mile corridor on I–471 from I–275 to Ohio River.
Status: Planned
Timeframe: 2035
Services
TM01–Infrastructure–Based Traffic Surveillance (KYTC) |
---|
TM05–Traffic Metering (KYTC) |
TM22–Dynamic Lane Management and Shoulder Use (KYTC) |