2050 OKI MTP TSMO Corridor 6 (Smart Lanes)
Description
Install/improve fiber, DMS, minor shoulder pavement, cameras, poles, ramp metering, hard shoulder running (HSR), power along 10–mile corridor on I–275 from I–71/75 to Combs–Hehl Bridge.
Status: Planned
Timeframe: 2035
Services
TM01–Infrastructure–Based Traffic Surveillance (KYTC) |
---|
TM05–Traffic Metering (KYTC) |
TM22–Dynamic Lane Management and Shoulder Use (KYTC) |