2050 OKI MTP TSMO Corridor 5 (Smart Lanes)
Description
Install/improve fiber, DMS, minor shoulder pavement, cameras, poles, ramp metering, hard shoulder running (HSR), power along 7 mile corridor on I–71/75 from Ohio River to I–275.
Status: Planned
Timeframe: 2027
Inventory
GoKY |
---|
KYTC District 6 Field Equipment |
---|
KYTC District 6 Planning |
---|
KYTC District 6 Traffic Operations Center |
---|
KYTC Dynamic Message Signs |
---|
KYTC Lane Control Devices |
---|
KYTC Ramp Meters |
---|
KYTC Speed Monitoring Roadside Equipment |
---|
KYTC Traffic Signal Control System |
---|
ODOT / KYTC Cameras |
---|
ODOT / KYTC HAR |
---|
ODOT / KYTC Traffic Counters |
---|
ODOT / KYTC Traffic Sensors |
---|
ODOT / KYTC Traveler Information System |
---|
TRIMARC (KYTC) |
---|
Services
TM01–Infrastructure–Based Traffic Surveillance (KYTC) |
---|
TM05–Traffic Metering (KYTC) |
---|
TM22–Dynamic Lane Management and Shoulder Use (KYTC) |
---|