BCRTA Traffic Signal Priority
Description
Implemented bus traffic signal priority along High Street to improve transit travel time.
Expand bus traffic signal priority along other key transit corridors to improve transit travel time.
Status: Existing and Planned
Timeframe: 2026 – 2032
Inventory
BCRTA Transit System Dispatch |
---|
BCRTA Transit Vehicles |
---|
City and County Connected Vehicle Roadside Equipment |
---|
City and County Field Equipment |
---|
City and County Traffic Control Center |
---|
Connected/Automated Vehicles |
---|
ODOT / KYTC Connected Vehicle Roadside Equipment |
---|
ODOT District 8 Field Equipment |
---|
ODOT District 8 Signal Operations |
---|
ODOT Traffic Signal Control System |
---|
Services
PT09–Transit Signal Priority (DriveOhio CV/AV) |
---|
TM04–Connected Vehicle Traffic Signal System (DriveOhio CV/AV) |
---|