TANK Traffic Signal Priority

Description

Implement bus traffic signal priority along key transit corridors to improve transit travel time.

Status: Planned

Timeframe: 2026 – 2032

Inventory

City and County Connected Vehicle Roadside Equipment
City and County Field Equipment
City and County Traffic Control Center
Connected/Automated Vehicles
CVG Airport Connected Vehicle Roadside Equipment
KYTC District 6 Field Equipment
KYTC District 6 Traffic Operations Center
KYTC Traffic Signal Control System
KYTC Traffic Signal Roadway Equipment
ODOT / KYTC Connected Vehicle Roadside Equipment
RAMP Transit Vehicles
TANK Transit System Dispatch
TANK Transit Vehicles

Services

PT09–Transit Signal Priority (Kentucky / TANK)
TM04–Connected Vehicle Traffic Signal System (Kentucky)
Privacy Policy | Terms of Use & Accessibility