2050 OKI MTP TSMO Corridor 8 (Smart Corridor)
Description
Interconnected and adaptive signal upgrade on US–27 (Colerain Ave.) from Struble Rd. to Blue Rock Rd.
Status: Planned
Timeframe: 2027
Inventory
City and County Cameras |
---|
City and County Field Equipment |
---|
City and County Traffic Control Center |
---|
ODOT / KYTC Cameras |
---|
ODOT District 8 Signal Operations |
---|
ODOT Statewide TMC |
---|
ODOT Traffic Signal Control System |
---|
ODOT Traffic Signal Roadway Equipment |
---|
Services
TM03–Traffic Signal Control (City and County) |
---|
TM03–Traffic Signal Control (ODOT) |
---|