2050 OKI MTP TSMO Corridor 4 (Smart Corridor)
Description
Create 3–mile corridor on KY–18 from I–75 to KY–237 with added wireless interconnect and 6 –20 suburban, adaptive, transit signal preemption.
Status: Planned
Timeframe: 2035
Services
PT09–Transit Signal Priority (Kentucky / TANK) |
---|
TM03–Traffic Signal Control (KYTC) |
TM04–Connected Vehicle Traffic Signal System (Kentucky) |