2050 OKI MTP TSMO Corridor 4 (Smart Corridor)

Description

Create 3–mile corridor on KY–18 from I–75 to KY–237 with added wireless interconnect and 6 –20 suburban, adaptive, transit signal preemption.

Status: Planned

Timeframe: 2035

Services

PT09–Transit Signal Priority (Kentucky / TANK)
TM03–Traffic Signal Control (KYTC)
TM04–Connected Vehicle Traffic Signal System (Kentucky)
Privacy Policy | Terms of Use & Accessibility