US 42 Corridor (Boone County) Signal Project
Description
US 42 Connection Traffic Signals Corridor. Currently in design phase (9/2021).
Status: Planned
Timeframe: 2021 – 2025
Inventory
City and County Field Equipment |
---|
City and County Traffic Control Center |
KYTC District 6 Field Equipment |
KYTC District 6 Traffic Operations Center |
KYTC Traffic Signal Control System |
KYTC Traffic Signal Roadway Equipment |
Services
TM03–Traffic Signal Control (KYTC) |
---|