US 42 Corridor (Boone County) Signal Project

Description

US 42 Connection Traffic Signals Corridor. Currently in design phase (9/2021).

Status: Planned

Timeframe: 2021 – 2025

Inventory

City and County Field Equipment
City and County Traffic Control Center
KYTC District 6 Field Equipment
KYTC District 6 Traffic Operations Center
KYTC Traffic Signal Control System
KYTC Traffic Signal Roadway Equipment

Services

TM03–Traffic Signal Control (KYTC)
Privacy Policy | Terms of Use & Accessibility