US-27 Corridor (KY) Phase 2
Description
Project would include the remaining portion of US–27 from 3rd Street to 11th Street in Newport and from Southgate boundary to NKU. Project would include installation and upgrade of advanced signal technologies such as adaptive signals, fiber optics to link the traffic control system, and potentially install CCTV technology. Project would include Newport, Southgate, Fort Thomas, Highland Heights, and NKU.
Status: Planned
Timeframe: 2026 – 2032